Summary
The SUBCONTRACT_COST_ELEMENTS Parameter controls which Object Codes that are maintained in the Object Code maintenance table are designated as Subcontract Cost Elements/Object Codes that should map to the PHS 398 Training Budget Form (Other Direct Costs section → Consortium Training Costs (if applicable) field).
Valid Parameter Value(s)
| Parameter Value | Description |
| <insert object code name> |
When modifying this parameter, institutions should enter comma delimited list of object codes names that should map to the PHS 398 Training Budget Form → Consortium Training Costs (if applicable) field (e.g. 420620,420600). (The Object Code Name can be obtained from the Object Code maintenance table.) |
Related Maintenance Table(s)
- Object Code
Related Parameter(s)
- TRAINEE_TRAVEL_COST_ELEMENTS
- TRAINING_REL_COST_ELEMENTS
- TUITION_OTHER_COST_ELEMENTS
- TUITION_POSTDOC_DEG_COST_ELEMENTS
- TUITION_POSTDOC_NONDEG_COST_ELEMENTS
- TUITION_PREDOC_DUAL_DEG_COST_ELEMENTS
- TUITION_PREDOC_SINGLE_DEG_COST_ELEMENTS
- TUITION_UNDERGRAD_COST_ELEMENTS
Example
The costs associated with the Object Codes maintained in the SUBCONTRACT_COST_ELEMENTS Parameter will populated as follows on the PHS 398 Training Budget Form if the Object Code is added to the PD Budget:

Comments
0 comments
Article is closed for comments.